Asphalt, through the years, has been considered as the most sustainable among road pavement materials, based on the following facts: 1. Vehicles consume less fuel and produce lower emissions due to its ability to produce a smooth surface on pavements., 2. Due to its smooth effect on pavements, this, therefore, results into a quiet passage of vehicles, thereby, giving no reasons to build expensive noise walls., 3. There is no bumpiness on the pavement and, therefore, it is safe. 4. The roads need not be removed or replaced., 5. It can be recycled. Learn more about Asphalt Columbus, go here.

Asphalt is a mixed product of aggregates, binder and filler and is used for constructing and maintaining all kinds of roads, as well as parking and sport areas. The following percentage mixture is employed in producing asphalt: about 5% of binder, which is commonly bitumen, and filler are mixed with 95% of the aggregates, crushed rock, sand, gravel or slags. Find out for further details on Paving Columbus right here.

Here are the step-by-step procedures in the process of installing asphalt pavement construction: 1. The existing road surface material, whether it is asphalt, concrete or pavers, is removed using heavy machinery, such as bobcats, forklifts, front loaders, and dump trucks., 2. Then the debris-free surface is graded to ensure that water will run-off appropriately because the presence of water causes damage, like potholes, cracks and heaving, and, therefore, proper water drainage is constructed., 3. The sub base is prepared, which is a stable surface incorporating base thickness, compaction and stability, to support the new pavement., 4. After grading and compaction of the sub base, a proof roll, which involves driving a dumb truck loaded with 72,000 pounds row by row of the entire surface, to ensure the underlying surface is strong and ready to support the new asphalt., 5. If the proof roll finds soft areas in the sub base, necessary repairs are done by undercutting method, which involves digging down below the surface, 2 or 3 feet, and replacing the underlying soft clay or soil with stronger aggregate material., 6. Then the binder, which binds the asphalt, is added which is made of large aggregate mixed with oil., 7. As soon as the support structures on the surface are installed, the surface is added with a top layer of fresh asphalt., 8. Then the road contractors smooth the new asphalt to the butt joints, which are areas comprising old concrete or asphalt, in order to have a smooth continuity of a road pavement., 9. As soon as the asphalt and butt joints have been laid, the entire new asphalt pavement is smoothed and compacted, using a roller truck.

Once the asphalt pavement has been installed, the roads undergo pavement markings or a striping process, which is a material or device that is used on a road surface in order to convey direction or official information to drivers to observe safety driving. Using paints for road markings are the most common materials, but for night time use, reflectorized paints are used to allow drivers to see the road surface signs.

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s